Repaired 28 shutters and 4 gable vents. Stained a chocolate brown to accent the brick work. Also re-caulked all (14) windows and six doors with silicone/latex mix for paintability and weatherproofing while remaining flexible for hanging temperatures. Total project time was approximately 2 1/2 days. Notice the difference between before and after photos to see the increase in the home's value.
Photo 1 is shutters before work and photo 2 is the renewed affect. Photo 3 demonstrates how much the gable vents needed attention. Photo 4 puts the the pieces together after the work was completed.